Saratoga High School Music Building

Los Gatos-Saratoga Joint Union High School District

This two-story music building features four separate ensemble rooms for orchestra, percussion, choir, and band programs, along with individual practice music rooms and a faculty office. The challenge of this project was to fit the facilities necessary for an exceptionally large program on a very tight footprint. The result is a very efficient layout while providing acoustic isolation between different music programs. This building is strategically located with a close proximity to the existing performing arts center at the front of the campus, and connected to the main student quad in the back; thus defining a portal to the campus.

Key Elements

K-12

Modernization

New construction

Details

Completed

2017

Construction Cost

$13,668,906

Project Area

22,000sq. ft.