Lynhaven Elementary School New Multi-Use Building

At the end of 2023, the Campbell Union School District occupied its new Multi-Use and Administration Building at Lynhaven Elementary School. Over the last decade, the District has been periodically replacing older obsolete multi-use buildings with new and larger Aedis-designed state-of-the-art facilities. Lynhaven is number four. Although each project is uniquely adapted to the campus on which it’s built, all are based on a prototype first constructed at Blackford Elementary School, which in its time, propelled the industry forward as part of a District-wide “Net Zero Energy/Emission” modernization goal. Today, the design still represents forward-thinking all-electric and solar-powered school design and looks fantastic.

Eventually, the old Multi-Use buildings at seven of the District’s campuses will be replaced. Forest Hill Elementary School’s MU will break ground this summer!

Aedis has been honored to partner with the District in a united effort to maximize the impact of its bond funding and leave a #PositiveLastingImpact on the entire CUSD community.